Cable yarding simulation

Cable yarding simulation VeroSim Cable Yarding

DE
EN
FR
Seilkran-Simulation 4.0
Based on the forest digital twin, timber harvesting with a cable crane can be simulated. Working times, machine hours and the timber assortments produced are added up and displayed graphically. The results can be used to compare different variants of line layout and intervention strength and thus determine an optimum.
Timber harvesting with cable crane system
Timber harvesting with cable crane system

Timber harvesting with a cable crane method is simulated and all work steps and the harvested timber assortments are totaled so that the results of the simulation can improve the executed felling.

Region of origin
2661551
Type of wood
Stemwood
Origin of wood
Forest
Mobilization Potential
> 50'000 m³ for Switzerland
Kind of wood concerned
Logs and whole trees
Impact on environment & biodiversity

Forests adapted to climate change thanks to intervention in inaccessible terrain.

Ease of implementation
Specialist knowledge is required
Economic impact
Reduced installation cost, improved profitability
Job effect
Optimized planning
Income effect
Improved profitability of logging in steep terrain
Costs of implementation ( Euro - € )
5000.00 €
Domain
Harvesting, infrastructure, logistics
Keywords
cable-crane digital-twin
Challenge addressed
5.- Enhance economic and environmental performance of forest supply chains
Type of solution
Advice and services for forest owners
Digital solution
Yes
Innovation
Yes
Country of origin
Switzerland
Region of origin
2661551
Scale of application
Cross-border/multi-lateral (several countries)
Start and end year
2021 - 2025
Contact data
Owner or author
Reporter
BFH-HAFL
Thür
References and Resources
Project reference
Cable yarding simulation 4.0
Resources
Project under which this factsheet has been created
Rosewood 4.0